Achieving an 11% reduction in pressure
From 54 to 64 with modifications, plus GPX index of 77.8% identified with CAPEX
Finding energy reduction of 13% per annum
We collaborated with a global tyre manufacturer to optimise its water pumping plant, a pressurised system to circulate cooling water for synthetic rubber processing
Through water pump monitoring we were asked to optimise a global tyre manufacturer’s plant, situated in a district of South Korea. The plant utilises a pressurised system that circulates cooling water for synthetic rubber processing.
Our objective was to reduce costs and energy within the manufacturing process. Integral to the project we used Green Pump Index (GPX) benchmarking.
Our fuller case study offers in-depth analysis of this project. It details the challenges faced, our approach and the solutions we implemented, as well as results achieved. You can request a copy by completing the form below.