• CASE STUDIES

    Blower performance tests at sewage works

    Using our testing system to examine blowers at a sewage treatment works, and identify energy and efficiency savings.

    Annual £30,500 savings

    If £88,00 invested in replacement of 2 blowers (payback 2.9 years)

    Extra £4,500 savings

    By immediately replacing pressure relief valves, filters and belts would make further annual savings

    Identified blower performance

    Highlighting that relative to other, blower 1 achieved 9% less flow and consumed 13% more power

    More about these performance tests

    Due to the high energy consumption of the blowers at this sewage treatment works, and the substantial maintenance costs, we were asked to complete performance tests to identify remedial works and find potential savings.

    We utilised our FREEFLOW portable pump testing system to test three 75kW twin-lobe positive displacement rotary lobe blowers that provide aeration to two separate lanes.

    Request a copy of our case study in full

    Our fuller case study offers in-depth analysis of this project. It details the challenges faced, our approach and the solutions we implemented, as well as results achieved. You can request a copy by completing the form below.

    Case study request form:





      I consent to Riventa collecting my personal details. This form collects your contact details so we can respond to you. You will also be added to our email list. Click here to read our privacy policy in full.