Providing the tools to reduce operating costs

We provided the tools to reduce operating costs at our South Korean client’s strategically placed pumping stations, which deliver safe drinking water to the country’s capital

Our client is a leading public sector utility company in South Korea, responsible for providing water across the Korean Peninsula. Working alongside the in-house team, our project objectives were to achieve consistency in the way station pumps were employed, minimise energy consumption and ensure cost savings. We used our portable FREEFLOW equipment for the pump tests.

 

Get more insight. 
Request a copy of our case study in full

Our fuller 4-page case study offers in-depth analysis of the above project. It details the assets we tested, the challenges we overcame, our approach and the results we achieved. Request a copy by completing the form below.

Series of water pumps at a pumping station

Our results in brief:

  • Our FREEFLOW data ensured greater consistency
  • Payback period for our equipment only 3 months
  • Annual energy saving of 15,893MWh
  • Annual cost saving of £1,668,765
  • Investment opportunities continue to yield savings




  • This form collects your contact details so we can respond to you. You will also be added to our email list. Click here to read our privacy policy in full.